Trenalia

Punctuality report · November 2026

From 2026-11-01 to 2026-11-19 · Renfe trains with GPS · month in progress

42.9 %arrivals 5 min late or less
92.9 %arrivals 15 min late or less
6 minmedian delay at destination
42journeys analysed

Previous month (October 2026): —% within 5 min, 0 journeys.

By product

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
re2343.5 %95.7 %7.7814
ic1136.4 %90.9 %7.6612
dart850 %87.5 %7.15.513.2

By route (the 20 with most journeys)

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
Drogheda (MacBride) → Grand Canal Dock3100 %100 %3.344.8
Grand Canal Dock → Maynooth333.3 %100 %6.399
Grand Canal Dock → Drogheda (MacBride)333.3 %100 %7.7711
Docklands → M3 Parkway30 %66.7 %15.31517.4
Malahide → Greystones2100 %100 %2.52.54.5
Greystones → Malahide250 %100 %8.58.511.3
Howth → Greystones250 %50 %101014.8
M3 Parkway → Docklands250 %100 %7.57.512.7
Grand Canal Dock → Hazelhatch and Celbridge250 %100 %7711
Dublin Heuston → Portlaoise250 %100 %6.56.58.5
Portlaoise → Dublin Heuston250 %100 %558.2
Greystones → Howth20 %100 %7.57.58.7
Dublin Pearse → Maynooth20 %100 %13.513.513.9
Newbridge → Dublin Heuston1100 %100 %000
Carlow → Dublin Heuston1100 %100 %111
Westport → Dublin Heuston10 %100 %666
Newbridge → Grand Canal Dock1100 %100 %333
Maynooth → Dun Laoghaire (Mallin)10 %100 %888
Dublin Heuston → Westport1100 %100 %555
Maynooth → Dublin Pearse10 %100 %777

By week

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
2026-W474242.9 %92.9 %7.5614

Sections where most time is lost

Not enough data this month.

ADIF incidents

Not enough data this month.

Free software (GNU AGPL v3)