Trenalia

Punctuality report · November 2026

From 2026-11-01 to 2026-11-19 · Renfe trains with GPS · month in progress

100 %arrivals 5 min late or less
100 %arrivals 15 min late or less
1 minmedian delay at destination
9journeys analysed

Previous month (October 2026): —% within 5 min, 0 journeys.

By product

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
re4100 %100 %1.311.7
dart3100 %100 %4.755
ic2100 %100 %0.50.50.9

By route (the 20 with most journeys)

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
Malahide → Greystones1100 %100 %555
Drogheda (MacBride) → Grand Canal Dock1100 %100 %111
Greystones → Malahide1100 %100 %555
Newbridge → Dublin Heuston1100 %100 %000
Grand Canal Dock → Maynooth1100 %100 %111
Carlow → Dublin Heuston1100 %100 %111
Howth → Greystones1100 %100 %444
M3 Parkway → Docklands1100 %100 %111
Grand Canal Dock → Hazelhatch and Celbridge1100 %100 %222

By week

Journeys% ≤ 5 min% ≤ 15 minMean (min)Median (min)P90 (min)
2026-W479100 %100 %2.215

Sections where most time is lost

Not enough data this month.

ADIF incidents

Not enough data this month.

Free software (GNU AGPL v3)